At Greyhound, I led user acceptance testing for a revenue-management system, defined test scenarios and worked with analysts and the vendor to resolve data-mapping and forecasting defects before launch.
Testing covered whether the new system had the right source data, whether that data was mapped correctly, and whether the forecasting behavior matched what the business expected.
What I led
- Defined test scenarios and expected behavior for the user acceptance testing workstream.
- Led testing with analysts and coordinated investigation of discrepancies.
- Validated source-data completeness and source-to-target mappings.
- Isolated forecasting issues and worked with the vendor on corrections before launch.
Check the data before relying on the forecast
During source-data validation, I found that required records had not been loaded and some fields had been mapped incorrectly. I identified the missing and mismapped data and drove the corrections before go-live.
These checks addressed the inputs to the system, so a forecast could be assessed against complete, correctly mapped data.
- Source completeness
- Expected behaviorRequired source records are available in the new system.
- Example issueMissing records from the source-data load.
- Field mappings
- Expected behaviorSource values populate the intended target fields.
- Example issueFields mapped incorrectly between source and target.
- Booking-curve grouping
- Expected behaviorHistorical bookings are grouped into the intended days-before-departure buckets.
- Example issueIncorrect bucket assignment affecting the demand forecast.
Investigate the forecasting behavior
Demand forecasts for casino-destination markets looked wrong during testing. I traced the issue to a code defect affecting how historical bookings were assigned to days-before-departure buckets when building the booking curve.
I isolated the root cause and reported the details to the vendor. The vendor corrected the forecasting code before launch.
Outcome
The missing and mismapped source data was corrected before go-live, and the vendor fixed the booking-curve defect before launch.